
Municipal case study
Mississauga Fire Station 106 & PRPS Satellite S-5
- Client / Owner
- City of Mississauga
- Architect of record
- Kleinfeldt Mychajlowycz Architects
- Sector
- Municipal
- Delivery
- General contract, public tender
- Capital value
- On request
The challenge
A 40-foot solid concrete hose tower specified with an architectural finish.
The Everstrong solution
Poured the tower in a single stage to avoid cold joints and deliver the finish as drawn.
The result
Second City of Mississauga station delivered.


